The build-out model
Where the AI build-out is physically happening, and a model of the question that matters most for the stocks on the Constraint Stack: when does the bottleneck move from memory to power?
Which constraint is tightest
Memory is the tightest constraint now. Power is the tightest next.
Every layer here is short of something, so "binding" on its own ranks nothing. Each one is scored on the same measures, from the same kinds of evidence, and the scores answer two separate questions: what holds output back today, and what will in two to three years.
Tightest now
Price, shortfall, and output visibly waiting on the layer. Waiting counts double: it is the direct test of which layer holds the others up.
- 1stMemory11/12
- 2ndPower7/12
- 2ndPackaging7/12
- 4thOptics6/12
Tightest next
How far ahead capacity is sold, whether buyers pay to secure it or redesign around it, and how long new capacity takes.
- 1stPower12/12
- 2ndMemory11/12
- 3rdOptics8/12
- 4thPackaging6/12
| Measure | Memory | Power | Optics | Packaging |
|---|---|---|---|---|
| Price of the scarce inputnow | 3 | 3 | 1 | 1 |
| Shortfall against demandnow | 2 | 2 | 3 | 2 |
| Output waiting on it (counts double)now | 3 | 1 | 1 | 2 |
| How far ahead it is soldnext | 3 | 3 | 2 | 1 |
| Buyers paying to secure supplynext | 3 | 3 | 3 | 2 |
| Buyers designing around itnext | 3 | 3 | 1 | 2 |
| Time to add capacitynext | 2 | 3 | 2 | 1 |
| Now, out of 12 | 11 | 7 | 6 | 7 |
| Next, out of 12 | 11 | 12 | 8 | 6 |
Memory · HBM and DRAM wafersNow 11/12 · Next 11/12Show the evidence
Tightest now. It is the only layer that buyers name, with dollars, as the thing holding their output back, and its price is still climbing on rising volume.
- Price of the scarce input: 3Up more than 50%, or at a price capDRAM contract prices up roughly 4x in 12 months (+93% to 98% in 1Q26, +58% to 63% in 2Q26, +13% to 18% in 3Q26). 2027 HBM prices up 121%. TrendForce, Jul 3, 2026
- Shortfall against demand: 25% to 15%Nvidia says supply covers about 70% revenue growth in fiscal 2028 against customer forecasts near 2x. TrendForce: HBM up 50% to 60% in 2027, short of demand. Nvidia CFO, via Silicon Analysts, Aug 27, 2026
- Output waiting on it: 3Several large buyers name it, with dollars or unitsDell's $95B AI server backlog: the limits are "DRAM, DRAM, DRAM." Nvidia calls its outlook supply-constrained and names memory. Microsoft and Amazon cite component costs, not power. Dell Q2 FY27 call, Sep 1, 2026
- How far ahead it is sold: 3More than 8 quartersSK hynix has long-term agreements with 14 customers covering more than half of its total capacity for 2027 and 2028, nine quarters out, and expects demand to exceed supply through 2030. SK hynix 3Q26 results, Oct 27, 2026
- Buyers paying to secure supply: 3Buyers funding the supplier's capacity, in billionsNvidia's supply commitments rose from $119B to $279B in one quarter, mostly memory. Micron holds 26 take-or-pay agreements and tens of billions in customer prepayments. Nvidia 10-Q, Q2 FY27, Aug 26, 2026
- Buyers designing around it: 3Flagship products or sites changed because of itNvidia is testing smaller HBM configurations for Rubin Ultra and halved SOCAMM on next Vera Rubin modules; cloud providers are cutting HBM on their next ASICs. TrendForce, Aug 4, 2026
- Time to add capacity: 224 to 36 monthsNew DRAM cleanrooms take 24 to 40 months. TrendForce sees meaningful new output only in late 2027 and substantial output in 2028. TrendForce, via Tirto, 2026-10
- Supplier pricing power (not scored)Micron gross margin 86.8%, from 44.7% a year earlier.
Power · Energized, AI-ready capacityNow 7/12 · Next 12/12Show the evidence
Tightest next. Everything that takes years is sold out, and buyers are already paying for their own generation. What it lacks today is broad evidence of chips sitting idle for want of it.
- Price of the scarce input: 3Up more than 50%, or at a price capPJM capacity cleared at the FERC cap three auctions running; uncapped it would have been about 67% higher. PJM all-in wholesale cost up 50% year on year. PJM, via Renewable Energy World, 2025-12
- Shortfall against demand: 25% to 15%PJM's 2027/28 auction came up 6.6 GW short of its reliability target (14.8% reserve against 20%). About a quarter of 2025's expected data center capacity slipped. Vacancy is 1%. Sightline Climate, via Semafor, Feb 24, 2026
- Output waiting on it: 1Anecdotes, or single-source reportsAbout $8B of Amazon GB300 racks reportedly warehoused for lack of power, roughly 0.3 GW, from one report Amazon disputes. NERC found AI sites coming online more slowly than planned. Business Insider, via LetsDataScience, Oct 20, 2026
- How far ahead it is sold: 3More than 8 quartersGE Vernova has about 10 GW of turbine slots left across 2029 and 2030. Step-up transformers take more than 160 weeks; a grid connection takes about 4 years, 7 in Northern Virginia. GE Vernova Q2 2026 results, Jul 22, 2026
- Buyers paying to secure supply: 3Buyers funding the supplier's capacity, in billionsHyperscalers hold about a third of GE Vernova's paid slot reservations and are funding gas plants directly, such as Google behind Black Hills' $1.8B build. GE Vernova Q2 2026 results, Jul 22, 2026
- Buyers designing around it: 3Flagship products or sites changed because of itAbout 40% of new US data center capacity through 2030 plans its own on-site power. Microsoft walked away from a UK site the grid could not serve until the 2030s. Enverus, 2026-07
- Time to add capacity: 3More than 36 monthsGrid connections take about 4 years, large transformers 2 to 4 years, heavy-duty gas turbines about 3 years. Only reciprocating engines and shells come in under 2 years. JLL 2026 outlook, via IREI, 2026-01
- Supplier pricing power (not scored)GE Vernova Power margin 18.8%, from 16.4%; Vertiv up 410 basis points.
Optics · Indium phosphide lasersNow 6/12 · Next 8/12Show the evidence
The largest measured shortfall, about 30%, and slow to fix. It caps supplier shipments, but no buyer has yet put a number on servers waiting for it.
- Price of the scarce input: 1Declines stopped, or up under 10%Transceiver prices have stopped their usual 15% to 20% yearly decline. No rising laser price series is published. Applied Optoelectronics CFO, via Yahoo Finance, 2026
- Shortfall against demand: 3More than 15%LightCounting puts demand about 30% above supply; Lumentum says it ships more than 30% below what customers want. LightCounting, 2026-04
- Output waiting on it: 1Anecdotes, or single-source reportsCoherent and Lumentum say laser supply caps their own revenue. No server or GPU deployment delay has been attributed to optics with a figure. Lumentum CEO, via Tom's Hardware, Jul 8, 2026
- How far ahead it is sold: 24 to 8 quartersCoherent's orders are booked into calendar 2028, 5 to 6 quarters ahead, with long-term agreements to the end of the decade. Coherent FQ4 FY26 call, via TIKR, Aug 13, 2026
- Buyers paying to secure supply: 3Buyers funding the supplier's capacity, in billionsNvidia put $2B of equity into each of Lumentum and Coherent in March, plus multibillion-dollar purchase commitments. TrendForce, Aug 6, 2026
- Buyers designing around it: 1Talk of alternativesMoves to continuous-wave lasers and silicon photonics still run on indium phosphide, so they shift the shortage rather than escape it. TrendForce, Aug 6, 2026
- Time to add capacity: 224 to 36 monthsLumentum's new plant, in an existing building, starts ramping in mid-2028, about 27 months out. Adding output on existing lines takes about a year. Lumentum, 2026-03
- Supplier pricing power (not scored)Coherent gross margin 40.2%, up about 2 points; Lumentum up about 12.6 points.
Packaging · TSMC CoWoS and substratesNow 7/12 · Next 6/12Show the evidence
Still short, and with one real casualty in Google's TPU plan, but easing: capacity roughly doubles each year and buyers have alternatives.
- Price of the scarce input: 1Declines stopped, or up under 10%No CoWoS-specific price increase disclosed. TSMC's 2027 wafer prices up 5% to 10%; substrate makers raising 3% to 5% a quarter. Nikkei Asia, via The Star, Jul 21, 2026
- Shortfall against demand: 25% to 15%Estimated about 10% short at the end of 2026 and 10% to 25% in 2027. TSMC's CEO: the gap is "still quite big," with "a little bit shortage on the back end." TSMC 3Q26 call, Oct 15, 2026
- Output waiting on it: 2A named buyer with a quantified hitGoogle cut its 2026 TPU target from about 4M to 3M units for lack of CoWoS, roughly a gigawatt of accelerators. Korea Economic Daily, via AI Weekly, 2026
- How far ahead it is sold: 12 to 4 quartersCoWoS is sold out through the end of 2026; TSMC's 2027 allocation is still being set. Sacra, relaying CNBC, 2026
- Buyers paying to secure supply: 2Deposits or take-or-pay at scaleNvidia is paying capacity-reservation advances to packaging and test suppliers, including $1.1B for new test capacity and an Amkor interposer expansion of more than 300%. Nvidia supply-chain release, Oct 21, 2026
- Buyers designing around it: 2Substitution at the marginGoogle plans Intel EMIB for its 2027 TPU; MediaTek runs EMIB alongside CoWoS; outside packagers handle about half of AMD's orders. TrendForce, Nov 25, 2025
- Time to add capacity: 112 to 24 monthsA new CoWoS line in an existing building takes about 12 months; TSMC has roughly doubled capacity each year. TrendForce, Mar 26, 2025
- Supplier pricing power (not scored)TSMC blended wafer price up about 23% in 2027, not a CoWoS-only figure.
Each measure is scored 0 to 3 against a fixed scale, shown under each score. The scores are judgments on the cited evidence, not a statistical model, and the scale is published so they can be checked. Scored as of Oct 27, 2026; memory and optics results due in the next two weeks will update several cells.
Where it is being built
Memory fabs, AI data center campuses, the chip and packaging plants between them, and the power built just for them. Each mark is sized by power where a figure exists, and every figure links to its source.
Pick a site
Click a mark on the globe or a name below to see what is being built, how big it is, when it comes online, and where the figure comes from. 115 sites, checked Oct 26, 2026.
Power estimates for most US AI campuses come from Epoch AI's Frontier Data Centers database (CC BY 4.0).
When does power take over from memory?
Memory is the tightest layer today and power the tightest next, so the date of the handover is the question that matters. Memory decides how many AI chips can ship; power decides how many can run. The model builds both from the bottom up in the same unit, gigawatts of IT power, names the tighter one every quarter, and reruns the whole thing over the range of every input to put odds on the answer. Start from the base case, then move the inputs you disagree with.
TrendForce memory growth, the SemiAnalysis pipeline, and 2025's on-time rate for what is still unbuilt.
On these inputs, memory is the tightest constraint until Q4 2029, when power takes over.
Across 1,000 runs that vary every input over its range and agree with what 2026 already shows, the tighter constraint at the end of 2026 is memory in 71% of them; at the end of 2027, memory in 54%; at the end of 2028, power in 53%; and at the end of 2030, power in 65%. By the end of 2030 about 11 GW of accelerators would be waiting for power.
New capacity each quarter
Gigawatts of critical IT power per quarter, outside China.
What piles up
GW left over at each quarter end: the side with nothing left over is the tighter one. A leftover under 10% of the past year's installs is a narrow lead. Arrowheads mark ranges that run past the chart; hover a fourth quarter for the full range.
Which is tighter at year end, share of runs
- 202671%29%
- 202754%46%
- 202848%53%
- 202940%60%
- 203035%65%
Memory tighterPower tighter
How to read the odds
Each run draws every input from its range at once, with the published low and high as the 10th and 90th percentiles. Runs that leave more than 1.5 GW stranded on either side by the third quarter of 2026 are dropped, because 2026 shows far less than that: 1,000 of 2,573 draws pass. Inputs are drawn independently, which understates the odds of every bad surprise arriving together.
What moves the answer most
Change in the 2028 year-end balance when one input moves to the low or high end of its range. Right means more chips waiting for power. Base: −3.1 GW.
- HBM shipped, 2026HBM shipped, 2026: at 2.70 EB the balance is −17 GW; at 3.75 EB it is 12 GW.
- Memory per chip versus the roadmapMemory per chip versus the roadmap: at 0.82× the balance is 17 GW; at 1.08× it is −9.7 GW.
- Share of new capacity serving AIShare of new capacity serving AI: at 70% the balance is 8.4 GW; at 88% it is −12 GW.
- Share of HBM reaching deployed acceleratorsShare of HBM reaching deployed accelerators: at 76% the balance is −13 GW; at 92% it is 4.3 GW.
- IT capacity planned outside China, 2027IT capacity planned outside China, 2027: at 45 GW the balance is 5.4 GW; at 55 GW it is −8.7 GW.
- Pipeline growth per year, 2028 to 2030Pipeline growth per year, 2028 to 2030: at −18% the balance is 4.2 GW; at +25% it is −9.4 GW.
- Pipeline energized on schedule, from 2027Pipeline energized on schedule, from 2027: at 56% the balance is 2.3 GW; at 82% it is −7.7 GW.
- HBM growth, 2027HBM growth, 2027: at 50% the balance is −5.1 GW; at 68% it is 2.1 GW.
Input at its low endInput at its high end
| Year | HBM shipped | Watts per GB | Chips ready | Power ready | Installed | Chips waiting | Power waiting | Tighter at year end |
|---|---|---|---|---|---|---|---|---|
| 2026 | 3.20 EB | 8.0 | 19 GW | 20 GW | 19 GW | 0.0 GW | 1.3 GW | Memory tighter, narrowly |
| 2027 | 4.96 EB | 8.6 | 31 GW | 33 GW | 31 GW | 0.0 GW | 2.5 GW | Memory tighter, narrowly |
| 2028 | 6.70 EB | 7.4 | 39 GW | 40 GW | 39 GW | 0.0 GW | 3.1 GW | Memory tighter, narrowly |
| 2029 | 9.04 EB | 6.8 | 48 GW | 45 GW | 48 GW | 0.5 GW | 0.0 GW | Power tighter, narrowly |
| 2030 | 12.20 EB | 6.2 | 59 GW | 49 GW | 49 GW | 11 GW | 0.0 GW | Power tighter |
How the model works
- One unit. Everything is gigawatts of critical IT power outside China: the power the accelerators, their host CPUs, networking and storage draw. Grid power is about 1.2 times that. The power forecasts used here already count IT power, so nothing is converted on the way in.
- Chips, from memory. HBM is sold out, so the memory shipped each year caps how many accelerators can be built. HBM shipped, times the share that ends up in deployed accelerators, times the watts each gigabyte of HBM brings with it, gives the gigawatts of chips. Exabytes times watts per gigabyte is gigawatts.
- Watts per gigabyte, from the product mix. A GB300 carries 288 GB and draws about 2.15 kW all in, so 7.5 W per GB. A Vera Rubin carries the same memory at about 3 kW, so 10.4 W per GB. A 1 TB Rubin Ultra would bring only 4.5. The yearly figure is the average over each product's share of that year's HBM (tables below). This is where memory per chip enters: heavier memory per chip means fewer chips per gigabyte.
- Shipment to running. Chips arrive at their data center about one and a half quarters after they ship, for transit, rack integration and bring-up.
- Power. SemiAnalysis's pipeline of IT capacity, 25 GW in 2026 and 51 GW in 2027. 2026 is mostly behind us and counts as delivered. From 2027 a share arrives on schedule and the rest slips by an average of four quarters rather than disappearing. Only the share serving AI counts, plus power freed when old accelerators retire from halls that can take new ones.
- Which is tighter. Each quarter, installed capacity is the smaller of chips on hand and power on hand. Leftover chips wait for power; leftover power waits for chips. The side with nothing left over is the tighter constraint, so the model always names one. A leftover under 10% of the past year's installs is inside the error of the inputs, so that lead is marked narrow. Power takes over in the first quarter it is the tighter side and stays that way.
- The odds. The model is rerun with every input drawn from its range at once; the published low and high are the 10th and 90th percentiles of each draw. Runs that contradict what 2026 already shows are dropped: by the third quarter only about 0.3 GW of racks were reported waiting for power and vacancy was near 1%, so a run leaving more than 1.5 GW stranded on either side is not this world. About four in ten draws pass, and 1,000 are kept. The sensitivity chart moves one input at a time.
Three ways to count 2026
The weakest input is the absolute HBM total, because no firm publishes a solid one. So the 2026 chip supply is counted three independent ways. They land within 5% of each other.
| Method | Arithmetic | IT GW |
|---|---|---|
| HBM shipped × share deployed × watts per GB | 3.2 EB × 85% × 8.0 W/GB | 21.7 |
| Nvidia revenue ÷ revenue per GW ÷ Nvidia's share | $374B ÷ $25B per GW = 15.0 GW of Nvidia, at about 70% of accelerator power | 21.4 |
| Units × all-in kW | 6.5M Nvidia × 2.1 kW, 3M TPU × 1.15, 2M Trainium × 1.0, 0.6M AMD × 2.1, plus others | 20.7 |
If Nvidia's revenue per gigawatt is quoted per gigawatt of grid power rather than IT power, the second estimate falls to about 18 GW. That is the main reason the HBM range runs as low as 2.7 EB.
Watts per gigabyte of HBM, by accelerator
| Accelerator | kW all-in | HBM, GB | W per GB |
|---|---|---|---|
| Nvidia H100 | 1.45 | 80 | 18.1 |
| Nvidia H200 | 1.45 | 141 | 10.3 |
| Nvidia B200 / GB200 | 2.00 | 192 | 10.4 |
| Nvidia B300 / GB300 | 2.15 | 288 | 7.5 |
| Nvidia Vera Rubin | 3.00 | 288 | 10.4 |
| Nvidia Rubin Ultra (1 TB as announced) | 4.60 | 1024 | 4.5 |
| Google TPU v6e | 0.50 | 32 | 15.6 |
| Google TPU v7 Ironwood | 1.15 | 192 | 6.0 |
| Google TPU 8 (8t, 8i) | 1.50 | 252 | 6.0 |
| AWS Trainium2 | 0.90 | 96 | 9.4 |
| AWS Trainium3 | 1.30 | 144 | 9.0 |
| AMD MI355X | 2.10 | 288 | 7.3 |
| AMD MI455X (Helios) | 3.20 | 432 | 7.4 |
| Meta MTIA 400 class | 2.00 | 288 | 6.9 |
| Share of HBM | 2025 | 2026 | 2027 | 2028 |
|---|---|---|---|---|
| Nvidia H100 | 6% | · | · | · |
| Nvidia H200 | 14% | 3% | · | · |
| Nvidia B200 / GB200 | 45% | 15% | · | · |
| Nvidia B300 / GB300 | 5% | 45% | 15% | · |
| Nvidia Vera Rubin | · | 3% | 45% | 30% |
| Nvidia Rubin Ultra | · | · | · | 25% |
| Google TPU v6e | 4% | · | · | · |
| Google TPU v7 Ironwood | 8% | 15% | · | · |
| Google TPU 8 | · | · | 18% | 20% |
| AWS Trainium2 | 10% | 4% | · | · |
| AWS Trainium3 | · | 5% | 8% | 8% |
| AMD MI355X | 6% | 6% | · | · |
| AMD MI455X | · | · | 8% | 9% |
| Meta MTIA 400 class | 2% | 4% | 6% | 8% |
| Watts per GB | 10.2 | 8.0 | 8.6 | 7.4 |
All-in kW is rack power per chip times 1.14 for networking, storage and CPU servers. Shares are estimates from unit forecasts and roadmaps, not reported figures. After 2028 no roadmap is firm; watts per GB falls 8% a year (6.8 in 2029, 6.2 in 2030), the direction every generation since Hopper has moved.
Inputs with a source
Data center IT capacity added outside China
15.6 GW (2025), about 25 GW (2026), about 51 GW (2027)
SemiAnalysis's forecast, defined as additions to critical IT capacity outside China, so it enters the model without a PUE conversion. About three quarters of the 2027 figure is already operational or under construction.
SemiAnalysis, via Yahoo Finance Chart of the Day, Oct 20, 2026
How much of the pipeline arrives on time
About 64% to 74% on schedule in 2025
Sightline Climate found 26% of capacity expected in 2025 slipped and another 10% of projects quietly moved their dates. Most late projects slip 6 to 18 months rather than being cancelled.
Sightline Climate, via Semafor, Feb 24, 2026
2027 pipeline at risk
30 of 55 GW expected to arrive
Seaport Research's estimate for announced 2027 capacity. Bernstein puts 35% to 40% of announced capacity at risk. Both sit at the pessimistic end of the realization range.
Seaport Research, via Barron's and Yahoo Finance, Oct 23, 2026
Powered space sitting empty
1.4% vacancy in North America
CBRE measures vacancy as available powered capacity in the primary markets: 0.2% in Northern Virginia. JLL puts it at 1% with 95% of construction preleased. There is almost no empty powered space for chips to fill.
CBRE, North America data center trends H1 2026, Sep 8, 2026
Chips already waiting for power
About $5B of GB300 racks in August, then about $3B a month
Internal Amazon emails describe racks staged in warehouses where sites have space but not power. At about $3.5M to $4M and 135 kW per rack, $3B a month is roughly 0.1 GW of IT a month. Amazon disputes the reading.
Business Insider, via LetsDataScience, Oct 20, 2026
HBM bit shipments, 2027
Up 50% to 60%
TrendForce's projection, which it says still falls short of demand. Its earlier share figures (HBM at 9% of DRAM bits in 2026 and 13% in 2027) imply closer to 80%, so the range runs a little above 60%.
TrendForce, DRAM supply to remain tight in 2027, Aug 4, 2026
HBM bit shipments, 2026
About 3.2 EB (30B Gb is 3.75 EB)
No firm publishes a solid absolute figure. One secondary source cites TrendForce at more than 30 billion gigabits. A bottom-up count of 2026 accelerators (about 6.5M Nvidia packages, 3M TPUs, 2M Trainium, 0.6M AMD) gives about 2.7 EB in deployed chips. The base case sits between the two, with yield and inventory losses between shipped and deployed.
TrendForce, HBM demand to grow over 70% in 2026, Oct 30, 2025
HBM share of DRAM wafers
18% (2025), 22% (2026), 30% (2027)
TrendForce's share of DRAM wafer input going to HBM. A Samsung executive gave the same 30% for 2027. New cleanrooms (SK hynix Yongin from early 2027, Micron Idaho from mid-2027) set how fast bits can grow after that.
TrendForce, HBM share of DRAM, Jun 2, 2026
Memory sold two years out
More than 50% of SK hynix's 2027 and 2028 capacity under long-term agreements
Fourteen customers, typically on five-year terms. SK hynix expects HBM4 to pass HBM3E in shipments in the fourth quarter of 2026, with its M15X fab at full capacity by year end, and demand above supply through 2030. A contracted, on-schedule HBM4 ramp takes away most of the slow-ramp case for 2027.
SK hynix 3Q26 results, Oct 27, 2026
Memory already sold
More than 75% of Micron's fiscal 2027 shipments committed
Micron also said the vast majority of its calendar 2027 HBM is contracted at significantly higher prices, and that the industry's principal constraint is cleanroom space.
Micron Q4 fiscal 2026 earnings call, Sep 30, 2026
Memory per chip is under review
Rubin Ultra: 1 TB announced; 192 GB to 384 GB variants tested
Nvidia is evaluating smaller HBM configurations for Rubin Ultra, and several cloud providers are doing the same for their next ASICs. Less memory per chip means more chips, and more watts, per gigabyte of HBM.
TrendForce; The Information via Tom's Hardware, Aug 12, 2026
All-in IT power per accelerator
2.0 kW (GB200) to 3.0 kW (Rubin) per package
Rack power per chip times 1.14 for networking, storage and CPU-only servers, Epoch AI's ratio from Nvidia's reference design. Cross-checked against HPE's 132 kW GB200 rack, SemiAnalysis's 180 to 220 kW Rubin rack, and Google's 10 MW per 9,216-chip Ironwood pod.
Epoch AI, GPU power usage in AI data centers, Dec 18, 2025
Shipment to running
About 6 months at a prepared site
Nvidia's own figure for install, bring-up and validation in a ready building. Epoch AI uses 3 months. Custom chips going into owned, pre-powered halls lag about one quarter.
Nvidia newsroom, DSX POD, Oct 21, 2026
Accelerator useful life
5 to 6 years
Hyperscaler depreciation lives: Microsoft 6 years for cloud servers, Meta 5.5, Amazon cut part of its fleet to 5. No changes in 2026 filings. Retired chips free power only where the hall can take a newer, hotter rack.
Meta 10-K, fiscal 2025, Dec 31, 2025
What gates power after 2027
Gas turbines sold out to about 2029
GE Vernova has 116 GW in backlog and slot reservations against about 20 GW a year of output today. Siemens Energy quotes lead times of three years or more. Large transformers are past 160 weeks. That caps how fast the pipeline can grow after 2027.
GE Vernova Q2 2026 results (8-K), Jul 22, 2026
Nvidia data center revenue, fiscal 2027
About $374B
Reported $75.2B (Q1) and $89.0B (Q2), about $100B implied by the $108B Q3 revenue guide, and Q4 assumed 10% above Q3. Used only for the cross-check below, not as a model input.
Nvidia, Q2 fiscal 2027 results, Aug 26, 2026
Nvidia revenue per gigawatt
$18B (Hopper), $25B (Blackwell), $40B (Vera Rubin)
Colette Kress on the Q2 call, repeated by Jensen Huang, who put total data center capex at about $60B per gigawatt. Nvidia also said fiscal 2028 revenue should grow about 70%, and that this is what supply allows.
Nvidia Q2 fiscal 2027 earnings call, Aug 26, 2026
Assumptions with no single source
- Share of HBM reaching deployed accelerators. Losses to stacking yield, inventory and non-accelerator uses. The base case uses 85%, with a range of 76% to 92%.
- Share of retired power reused for new chips. Older halls are often air-cooled and cannot take liquid-cooled racks. The base case uses 40%, with a range of 20% to 65%.
- The product mix. The share of each year's HBM going to each accelerator, above.
What the model leaves out
- No feedback. Real buyers defer orders when they cannot power them, and developers slow down when chips are scarce. The model instead lets the leftover pile up, which makes the size of the gap a measure of pressure, not a forecast of warehouses.
- One pool. Chips waiting in Virginia cannot use empty power in Texas. Geographic mismatch is why both constraints can show up at once, as they do in 2026, and the model treats a gap inside 10% as both binding for that reason.
- Packaging moves with memory. TSMC's CoWoS capacity and HBM supply have been planned together, so packaging is not modeled as a separate limit. If one ran well ahead of the other, the slower one would set chip output.
- Independent draws. The uncertainty run varies each input on its own. In a real downturn several inputs would miss together, so the tails are wider than shown.
- Gigawatt definitions. SemiAnalysis counts critical IT power. Deal announcements and campus sizes often count facility or grid power, about 20% higher. Every figure here is converted to IT power, but the deal figures carry that slack.
- Outside China only. China's accelerators use domestic memory and its data center figures are not comparable.
Model inputs as of Oct 27, 2026.
One lab's share of it
Anthropic's S-1 lists its compute contracts in dollars. The counterparties' own announcements put gigawatts on most of them. Against the base case, Anthropic alone has contracted about 14% of all the AI capacity that will be running outside China by the end of 2027: roughly one gigawatt in seven.
End of 2026
11%
Range 8% to 15%, of about 39 GW installed
End of 2027
14%
Range 8% to 20%, of about 71 GW installed
End of 2028
14%
Range 9% to 18%, of about 110 GW installed
| Counterparty | Dollars in the S-1 | Gigawatts | How firm | Gigawatt source |
|---|---|---|---|---|
| Google and Broadcom (TPU) | $114.5B Google; $161.2B Broadcom leases | Over 1 GW in 2026; about 3.5 GW through Broadcom from 2027 (stated) | Take-or-pay and non-cancelable leases | Broadcom 8-K, via Tom's Hardware, Apr 7, 2026 |
| Amazon (Trainium) | $110.0B | Up to 5 GW; nearly 1 GW by end of 2026 (stated) | Take-or-pay | Anthropic, Apr 20, 2026 |
| Microsoft (Nvidia) | $44.9B | Up to 1 GW (stated) | Take-or-pay, per tranche | Microsoft and Nvidia announcement, via PureAI, Nov 18, 2025 |
| SpaceXAI (Nvidia) | Up to $120.5B | About 1.2 to 2.0 GW (derived) | Cancelable on 90 days' notice from early 2027 | Colossus 1 at over 300 MW for 220,000 GPUs, via DCD, May 6, 2026 |
| AMD (Helios) | More than $20B | Up to 2 GW; the first from 2027 (stated) | Committed initial tranche, no fixed dollars | AMD, Jul 22, 2026 |
| Nscale (Nvidia) | Up to $44.6B | About 460 MW (reported) | Depends on Nscale's financing | VKTR, citing Bloomberg, Aug 26, 2026 |
| Lambda (Nvidia) | About $41.3B | About 350 MW for the $34.9B deal (reported) | Terminable if the facility lease slips | Reuters, via The Standard, Sep 1, 2026 |
Contracted capacity online: about 4.5 GW at the end of 2026 (range 3.2 to 5.9), 10 GW at the end of 2027 (6 to 14) and 15 GW at the end of 2028 (10 to 20). The SpaceXAI figure is derived from its disclosed price per GPU and Colossus 1's power; it can be cancelled from early 2027. Installed AI capacity starts from about 20 GW at the end of 2025 (Epoch AI, AI data center power (31.2 GW facility worldwide, converted to IT outside China), Feb 16, 2026) and adds the base case's installs. Read the full breakdown in the S-1 signal.
What would move the answer
Memory makers' third-quarter numbers
Samsung reports on October 29, with SK hynix around the same time. The 2026 HBM total is the input that moves the answer most and the one with the thinnest public record. Any hard bit figure tightens the whole model.
Memory on the stackRubin Ultra's final memory
Nvidia announced 1 TB of HBM per package and is testing 192 GB to 384 GB versions. A smaller configuration means more chips per gigabyte of memory, and pulls the switch to power earlier.
Memory on the stackHow much of 2027 actually energizes
Seaport expects about 30 of 55 GW of announced 2027 capacity. Each point of on-time delivery is worth about 0.4 GW of AI capacity. Watch force majeure notices, interconnect slips, and warehoused racks.
Power on the stackTurbine and transformer slots
GE Vernova reports on October 28. Its backlog and slot reservations set how fast the pipeline can grow after 2027, which is the input that decides 2029 and 2030.
Power on the stack
Both are showing up now
Chips waiting for power
Microsoft's CEO said the company could end up with chips sitting in inventory it cannot plug in, for lack of warm shells.
Satya Nadella, Microsoft, Nov 2025
An internal AWS email described about $5B of GB300 racks held in warehouses because some sites lack power. Amazon disputes the reading.
Microsoft exited a 23,040-GPU site in England after reports that the grid could not supply it until the 2030s.
Reuters, via BusinessDay, Oct 2026
Servers waiting for memory
Dell's CEO said the memory shortage may be a four-year problem, with a $95B AI server backlog waiting on DRAM and HBM.
Michael Dell, on CNBC, Oct 2026
IDC found server shipments held back by DRAM and NAND supply: buyers are not getting servers as fast as they need them.
IDC server tracker, Q1 2026, Jun 2026
What it means for the stocks
A bottleneck is where pricing power sits. While memory binds, memory makers set prices and buyers prepay for supply. When power binds, the scarce thing becomes energized capacity: grid connections, on-site generation, turbines, transformers, and the operators who already hold powered sites.
Memory holds the pricing power now, and the evidence for that is broad: price, prepayments, buyers redesigning chips around it, and the largest backlogs naming it. The supply arithmetic puts memory ahead of power only narrowly, though, and the odds tilt toward power from 2029, because memory supply can compound at 35% a year while turbines, transformers and grid connections are sold out to the end of the decade. The handover does not end memory demand. It changes who has the leverage, and the market tends to reprice that before the reported numbers show it.
Research and analysis, not investment advice. Calls are measured from the day they are published. The author may hold positions in companies discussed.