The chokepoint keeps moving upstream
Optical scarcity has moved from the transceiver to the indium phosphide laser, and the wafer under it is next. What that means for owning the layer.
Published from the research archive on . Figures are as of the writing date; the update at the end is current.
Contents
The AI optical trade has a habit worth naming. Every time the market finishes pricing the obvious winner, the binding constraint has already moved one layer upstream, and the money that matters moves with it. The transceiver makers were the trade. Now the constraint sits in the indium phosphide layer: the lasers grown on InP wafers today, and increasingly the wafers themselves. This is not a verdict on who wins co-packaged optics. It is a read on where the optical stack is short right now, and what that says about how to own it.
There is a clean tell that the migration is real. When the integrated incumbents stop selling the upstream part to anyone else, the constraint has moved beneath them. That is what Coherent said in August.
Map the chain
Start with the map, because the whole argument lives in it. The optical layer is a stack, and each rung has a named public company and a different degree of tightness.
| Layer | What it is | Named public node | Where it binds |
|---|---|---|---|
| Substrate | Indium phosphide wafer the laser grows on | JX Advanced Metals (5016-JP), AXT (AXTI), Sumitomo Electric (5802-JP) | Tightening. 6-inch InP up about 250% since China’s export controls; JX building 7 to 10 times its capacity; Lumentum reserving AXT supply through 2031 |
| Epiwafer | III-V epitaxy on the wafer | IQE, IntelliEPI | Second order |
| Laser and device | CW and DFB InP lasers, EMLs | Coherent, Lumentum (LITE), MACOM (MTSI), Sivers (SIVE) | Binding. Coherent and Applied Optoelectronics consume their own InP output; merchant demand pushed toward Lumentum, MACOM and Sivers |
| Transceiver and engine | 1.6T pluggables, CPO and NPO engines | Coherent, Applied Optoelectronics (AAOI), Credo (CRDO), Jabil | Was the trade; now gated by the laser beneath it |
| Switch and system | Scale-up and scale-out silicon | Marvell (MRVL), Broadcom, Nvidia | Demand pull |
Read it top down and the point is plain. The datacenter needs light. Light comes from a laser. The laser is grown on an indium phosphide wafer. And InP wafers come from a handful of suppliers: two Japanese conglomerates where the material is a small line in the revenue, and one small US-listed company whose wafers are made in China and gated by export permits. The binding constraint today is the laser rung, two steps below the transceiver buyers everyone traded a year ago. The rung under it is where the next squeeze is forming.
The one number that says it is real
If you want a single disclosure that proves the layer is tight, take Coherent’s fiscal fourth-quarter call on August 12. The most vertically integrated optical incumbent in the West said fiscal 2027 is “basically completely booked out,” that customer orders now extend into calendar 2028, and that long-term agreements run through the end of the decade. Then the load-bearing line: “we are not constrained in the assembly and test capacity right now,” and “we are really just constrained by the ramp of the indium phosphide production.” On the same call, the CEO said he does not “see any time in the near future where we would be selling Indium Phosphide lasers externally,” because transceiver demand absorbs every bit of capacity.
Read that line carefully, because it is easy to over-read. Coherent’s constraint is its own InP laser output, the 6-inch fabs in Texas and Sweden it is doubling, not the raw wafer. On the same call it said it has secured the substrates for that ramp. Applied Optoelectronics said the same about substrates on its August 6 call, with supply secured into next year. Its CFO also said customers want its high-power laser for co-packaged optics but the company cannot make enough of them to take part in first-generation deployments, because its own transceivers come first. Translation: the binding rung today is the laser, and the two incumbents that grow their own are keeping every one.
The substrate is the rung beneath, and the evidence there is price and reservation, not missed shipments yet. Since China’s export restrictions on InP began in February 2025, the average 6-inch InP wafer price has risen 250 percent to 5,000 dollars, and AXT’s Chinese subsidiary only received its first export permits in June 2025 against a significant backlog (Reuters, June 2026). On July 29, Lumentum signed a capacity reservation with AXT that runs through 2031 and comes with two deposits of 43.5 million dollars each (AXT release). A laser maker does not prepay for wafers five years out in a layer that is comfortable.
Confirmation is not opportunity
Being right that a layer is tight is not the same as being paid for it. The named names have already re-rated, and the re-rate is the market pricing the start of the shift, not an invitation. Here is where the thesis sits in the price, marked at the 2026-09-01 close.
| Name | Price | Market cap | Off its 52-week low |
|---|---|---|---|
| Coherent (COHR) | 272 | ~53B | ~3.2x |
| Lumentum (LITE) | 869 | ~65B | ~7x |
| Applied Optoelectronics (AAOI) | 103 | ~8.4B | ~5.6x |
| Credo (CRDO) | 207 | ~38B | ~2.4x |
| MACOM (MTSI) | 262 | ~20B | ~2.1x |
| AXT (AXTI) | 56 | ~3.4B | round-tripped from under 3 to above 140 to 56 |
None of this is cheap in absolute terms, and the complex sold off the day I marked it, Credo down almost 9 percent in a session. But Coherent and Applied Optoelectronics trade at roughly 5 and 3 times consensus revenue for their next fiscal year, revenue that is largely booked and ships from capacity that exists. Sivers, the purest merchant laser name, trades near 16 times the one published 2027 revenue estimate I can find, against an opportunity pipeline rather than backlog. That gap is the entire question. Either the integrated incumbents are cheap for a booked-out oligopoly, or the pipeline names are pricing a 2028 that has to arrive on schedule.
The binary everyone is handicapping is the wrong one
The obvious binary is a beauty contest: who wins the CPO laser socket, the merchants (Sivers, MACOM) or the incumbents keeping it in house. I think that is the wrong binary, and following it through shows why.
The socket contest is a 2028 story no matter who wins it. MACOM is planning for a potential start of CW laser production in late calendar 2027. Sivers expects its first Jabil production orders in the first half of 2027, after beta builds this year (Sivers Q2 letter). So the near-term variable is not who wins the socket. It is whether the incumbents keep their InP internal, and whether the layer stays short while co-packaged optics scales. Handicap that instead:
- The InP layer stays tight and the incumbents keep it internal through end-2027: about 75 percent. Coherent said so explicitly, it is booked out, and it described CPO demand as pulled in, not pushed out. This outcome reads through to the integrated incumbents.
- Merchant timing or a partial loosening: about 15 percent. External merchant volume arrives earlier than 2028, or an incumbent opens its fab to outside buyers, and the 2028 story slips forward.
- Designed around or oversupplied: about 10 percent. An AXT export normalization, a transceiver inventory correction, or JX’s capacity arriving into a demand top. This is the classic capex-at-the-top risk.
The variable that governs the next twelve months is InP tightness plus incumbent internalization. The laser socket beauty contest is the story that gets written; the InP layer is the fact that binds.
Escalator, not step
Re-rating is not the disqualifier. The question is whether this is a one-time step or a structural escalator, because escalator names keep running after the first re-rate and one-time stories stall. InP laser demand is an escalator. LightCounting expects 2026 to be the first year that transceivers using silicon photonics pass half the market (LightCounting), and every one of those needs an external CW laser grown on InP. Co-packaged optics raises the bar again: Applied Optoelectronics’ CEO put the CPO laser at about 300 milliwatts against 70 for an 800G transceiver, on a larger die at lower yield. CPO scale-up revenue starts to flow in the second half of calendar 2027 on Coherent’s own guide. The InP layer does not get a breather at the next node; it climbs.
The expression with the most structural runway is the one that owns InP internally and ships today, which is the integrated incumbents, not the merchant pure-play on a later clock. The single fact that governs continuation is whether Coherent and Applied Optoelectronics keep InP internal. The day one of them signs an external InP laser supply agreement is the day the merchant thesis loosens and the layer is easing.
One layer further down
Go a rung below the named names, into the substrate itself, and every public door has a caveat nailed to it. JX Advanced Metals is spending up to 120 billion yen over four years to raise InP capacity 7 to 10 times, funded largely from a May convertible bond (Semiconductor Today). It is also a copper and minor-metals group with 885 billion yen of revenue in the year to March, where InP is a thin slice that cannot move consolidated margins over the horizon that matters, and the stock trades near 34 times trailing earnings. AXT is the pure-play, and it has round-tripped from under 3 dollars to above 140 and back to 56 as China’s permit regime whipsawed it; it is a value trap or a chokepoint depending on the month, and the margin is not yet in the P&L. Sumitomo Electric is a diversified industrial where the InP line disappears into the whole, and it told Reuters it had seen no production impact from China’s controls. There is no clean, cheap, accessible InP substrate pure-play. That absence is itself the signal: the layer is tight partly because almost no one built a standalone business on it.
So I am not going to manufacture a winner here. The chain is picked over. The least re-rated node is the substrate, and there is no public instrument that gives you that node without buying either a conglomerate that dilutes it or a value trap that has already traded it twice.
The finding
The work landed on a real link in an awkward place. The most integrated incumbent in the stack is telling you, on its own call, that the binding constraint is its InP laser output and that it is keeping every laser it grows. The substrate under it is being priced and reserved years out. That decision to keep InP internal, not the co-packaged optics laser beauty contest, is the load-bearing fact of the whole layer. It concentrates external merchant demand onto a thin set of names that cannot supply it at scale until 2028, and it defends the incumbents’ booked revenue.
The edge is not a name. It is the read that the chokepoint reads through to the integrated incumbents at roughly 3 to 5 times booked revenue, not to the pipeline names at 16 times a forecast, and that the least re-rated layer beneath them has a caveat at every public door. The method is the value: map the stack, find the rung where the integrated player stops selling externally, and price the layer through the cheapest instrument that already ships.
The trigger that would change the read is a single fact, not a price: an external InP laser supply agreement out of Coherent or Applied Optoelectronics, or a break in 6-inch InP wafer pricing. Either one says the layer is loosening and the constraint has moved again.
Update, October 2026
The InP layer has stayed tight: on October 9 Lumentum’s CEO told Bloomberg Television the company is effectively sold out into early 2029 and cannot meet a large share of demand for some products through 2027 (TIKR summary). The expression did worse than the read. From the September 1 close to October 23, Coherent fell 23 percent, Applied Optoelectronics 35 percent and Credo 29 percent, against 13 percent for Lumentum, so the integrated incumbents I read as the better expression gave no shelter in an optical selloff. The layer read held while the expression read did not, which is the gap between being right about a chokepoint and being paid for it.
Get the next one by email
New essays and signals on the AI build-out and markets, sent when they publish. Free. Unsubscribe any time.
Prefer a feed? RSS.
Keep reading
Research and analysis, not investment advice. Calls are measured from the day they are published. The author may hold positions in companies discussed.